M39 TE Classic machines are used in high-volume restaurants, hotel banqueting, contract catering and busy traditional cafés nationwide. The engineer carries out the statutory PSSR examination, the front-end service and the water treatment on this model — a standalone examination is £295 + VAT, or £500 + VAT with the service included.

2, 3 and 4 group Single boiler Written Scheme of Examination

Quick answer

Does a La Cimbali M39 TE Classic need a PSSR examination?

Yes, if it operates in a workplace. It carries a single steam boiler with its own protective devices, which is the pressure system in scope. Steam is a relevant fluid under PSSR 2000 and steam systems are covered at any pressure and any volume, so the boiler must have a Written Scheme of Examination and be examined periodically by a competent person.

Examination only
£295
With service
£500
Call for a fixed price

The machine

Why the M39 TE Classic matters to the La Cimbali owner

The traditional high-output Cimbali — a large copper boiler and heat-exchanger groups, built for continuous service rather than theatre.

In practice you will find it in high-volume restaurants, hotel banqueting, contract catering and busy traditional cafés — which shapes what the examination looks like on site: how the machine is accessed, how long it can be offline, and how much scale it has accumulated.

On the day

  • The steam boiler is drained and inspected internally with an endoscope for scale, corrosion and weld condition.
  • The safety valve, anti-vac valve and fittings are checked and tested.
  • The pressure gauge is verified against our calibrated test gauge, not against itself.
  • A 3 group boiler holds more water than a 2 group, so the drain, refill and heat-up all take longer — allow the full appointment window.
  • The Written Scheme of Examination names the vessel and the protective devices it covers.

Typical rates for this model

Standalone PSSR examination
£295
Service + PSSR bundle
£500
Certified safety valve, if it fails
£60 + VAT
Water filter, fitted on a visit
from £107
Grinder calibration & deep clean
£89
If it does not pass
Explained in writing

All prices exclude VAT. The additional drain and heat-up time a 3 group boiler needs. We confirm the exact figure on the call.

Filters are fitted on site by an engineer and are not posted out. The filter price applies when ordered with a PSSR examination, service, call-out or water test; booked alone it is charged at the standard call-out.

What we see on this model

  • The boiler is the largest in the Cimbali range at up to 20 litres, so it holds far more stored energy than a compact machine and takes materially longer to drain, refill and bring back to pressure.
  • Heat-exchanger groups mean the brew circuit runs inside the steam boiler, so scale control on the mains supply matters more here than on most machines.
  • 2/3/4-group traditional machine: service boiler 5-11 L on the 2-group, 15 L on the 3-group and 20 L on the 4-group, with a 0.18-0.25 L heat exchanger per group (M39 engineer's manual data table). The fault codes come from the M39 Dosatron TE manual, which shares the boiler/hydraulic codes with the TE Classic; the Classic is not volumetric, so code 66 may not exist on it. Discontinued - absent from Cimbali's current sitemap, but M39-specific valves and elements are still stocked.

Verified boiler data

What is actually inside this machine

Manufacturer boiler capacities for the La Cimbali M39 TE Classic
ConfigurationSteam boiler
C2 (2 group) 10.0 L
C3 (3 group) 15.0 L
C4 (4 group) 20.0 L

Manufacturer's published boiler capacities. Where a maker publishes no figure we say so rather than estimate.

Service interval. The engineer's manual has no fixed month interval; maintenance is set by cycles/days in Configuration > Maintenance and fault 096 raises the reminder.

Source: La Cimbali M39 TE Classic C technical data

Fault finder

What actually goes wrong on a La Cimbali M39 TE Classic

Owners usually call us with a symptom, not a diagnosis. This is what that symptom most often turns out to be on this machine, and what putting it right involves.

Common faults on the La Cimbali M39 TE Classic
SymptomUsual causeWhat fixes it
Machine never reaches working pressure, or is lukewarm and slow Fault 052 “Boiler heating timeout — 45 minutes”. The manual points at the safety thermostat having tripped, an interrupted element, or the triac card. Reset and test the safety thermostat, then the element, then the triac card.
Boiler pressure erratic or climbing, safety valve discharging, water underneath Fault 058 “Boiler overpressure” — level probe failure, boiler overfilled, or an element that is always powered. Check the level probe and filling valve first; a constantly powered element is the dangerous case and needs the contactor or triac tested.
Coffee dose varies shot to shot, or a group stops dispensing while the pump runs Fault 66 “Error in the group that is dispensing” — no water reaching the group, flowmeter fault, blocked circuit or wiring. Work water supply, then flowmeter, then the group circuit. Note this code is from the Dosatron TE manual and may not apply to a TE Classic.
False fills, or the boiler drops and will not refill cleanly Fault 060 “Boiler-level signal errors”. The manual advises checking earthing and insulation — the level probe reads through the water, so a bad earth or a fouled probe gives a false level. Clean the probe, check its earth and insulation. The manual also exposes a level-probe sensitivity setting, because conductivity varies with water.
Slow heat-up, rumbling element, poor steam, then element failure Heavy scale and corrosion inside the copper boiler. Boiler descale and element check. Scale is the single biggest cause of element failure on this machine.
Water dripping from a steam or hot-water tap Tap gland and seat wear. Tap rebuild, or a complete steam/water valve where the body is worn.
Boiler overpressure alarm 058; safety valve discharges, pressure erratic or climbing. Level probe failure, boiler overfilled, element permanently powered, or temperature sensor out of range (M39 engineer's manual, 058). Clean/replace the level probe and reset its sensitivity, check the fill solenoid for let-by, check the element relay/triac, replace the sensor.
Boiler heating timeout 052 after 45 minutes; machine stays cold. Safety thermostat tripped, element resistance interrupted (cabling/fastons), or faulty triac card (manual, 052). Reset the safety thermostat, check element continuity and fastons, replace the element or triac card.
Boiler refill timeout 059; no water enters the boiler. No water, refill solenoid (EV) failure, interrupted wiring or board failure (manual, 059). Check supply, replace the refill EV, check wiring and board.
A group stops dispensing although the pump runs; fault (x)66. Flowmeter failure, blocked water circuit, or interrupted/grounded wiring (manual, 66). On volumetric Dosatron/Selectron variants only. Check flowmeter connections and pulses, clear blockages, replace flowmeter or board.
Boiler-level signal errors 060; unstable level and false fills. Earthing or insulation fault, leakage to earth (manual, 060). Check machine earth and insulation, clean the probe, check probe sensitivity.

These are faults documented for this model, not a generic list.

Common parts

Common parts for the La Cimbali M39 TE Classic

The components most often replaced on this machine, listed by reference number, as a reference for engineers and owners identifying a part.

Common parts for the La Cimbali M39 TE Classic
Part no.Description
#18293 M39 Steam Arm Kit
#18328 M39 Steam Knob
#2841 Element Protection Thermostat - Original
#0108 Flowmeter With Lead
#15933 44mm Top Piston Shower Plate
#15955 44mm Bottom Shower Plate
#15973 Cimbali / Faema Brew Grp Temp Sensor - Original
#18329 M32/M39 Boiler Level Probe 90mm
#28325 Steam / Water Valve Kit - Cimbali / Casadio / Faema
#1586 Shower Plate 52 X 5mm
#1786 Teflon Gasket 17 X1 2x 1 Mm
#0371 Shower Plate 60 X 17mm

Parts most often needed on this model

Parts commonly needed by the La Cimbali M39 TE Classic
PartNumberWhat it fixes
Heating element, 3-group 220/380 V 5790 W — Fault 052 / slow recovery; M39-specific element
Complete steam/water valve — Dripping or non-shutting steam/water tap
Pressurestat (Cimbali M21-M39) C_465 Pressure drift and short element cycling
Conical portafilter/group gasket 71x56x9 mm 401-261-010 Leak at the group/filter-holder rim
Heating-element flange gasket 401-194-000 Weep at the boiler face
Gicar flowmeter (volumetric variants) Gicar 9.0.26.11G / 9.0.56.11G Fault 66: no-dose / missing pulses

Questions

M39 TE Classic questions, answered

How a boiler of this size is examined, how often, and who carries the duty — see the complete PSSR guide.

0208 037 9340

How much does a PSSR examination cost on a La Cimbali M39 TE Classic?

A standalone examination is £295 + VAT, because the additional drain and heat-up time a 3 group boiler needs. Combined with a front-end service it is £500 + VAT, which is what most high-volume restaurants, hotel banqueting, contract catering and busy traditional cafés choose, since the boiler has to be drained for the examination either way. We confirm the exact figure on the call.

How often does a La Cimbali M39 TE Classic need examining?

The Written Scheme of Examination sets the interval, and for a commercial machine used in high-volume restaurants, hotel banqueting, contract catering and busy traditional cafés it is typically 12 to 14 months. A 3 group boiler holds a larger volume of water, so scale accumulates faster than in a smaller machine on the same duty and the scheme usually sets the shorter interval.

How long does a La Cimbali M39 TE Classic examination take, and what happens on the day?

A 3 group boiler holds more water than a 2 group, so the drain, refill and heat-up all take longer — allow the full appointment window. The visit runs: the steam boiler is drained and inspected internally with an endoscope for scale, corrosion and weld condition. the safety valve, anti-vac valve and fittings are checked and tested. The gauge is then verified against our calibrated test gauge, the system is pressure tested and held, and the machine is re-assembled, refilled, heated and function tested. The Written Scheme of Examination, signed report and asset record follow within 48 hours.

Other La Cimbali machines covered